Construction of the Screening Breakwater for LNG Terminal
in Swinoujscie
Employer:
Maritime Office in Szczecin
Construction of completely new screening breakwater to the East from opening to
the port of Świnoujście along with the groin adjacent to the existing eastern
breakwater. 3 km long breakwater has been built according to the design that
included a construction of:
- sandy and rocky core,
- gentle slopes of breakwater toe which were reinfirced with geotextile and X-bloc®
mound
- concrete superstructure along with concrete parapet wall
Additionally, dredging works were carried out within new turning basin and
approach fairway.
Time of implementation: 2010-2013